Type AThe flat cap
For joints between units set in the same plane: coping and balustrade tops, cornices, belt courses and the top joints of window and door lintels.
WEATHERCAP® sets into the sealant joint. It covers the caulk, halves the opening and creeps with the stone.
A soft lead tee cap set into the sealant. It covers the caulk from sun and water and halves the opening it has to bridge.


The joint is raked to depth and cleaned. Tape marks the cap width, a round backer rod goes in, and sealant is filled about 1/8 in. proud of the stone.

The soft lead tee cap is pressed into the sealant bed until the bonding grooves fill and no voids remain. The flange now covers the sealant, and the opening it must bridge is cut in half.

Buildings settle and stone moves. Lead's low creep strength lets the cap creep into the new configuration, and temperature change speeds it up.

The surface oxidizes rapidly to a dead neutral grey that blends with masonry, and keeps shielding the sealant from sun, water and mold.

The joint is raked to depth and cleaned. Tape marks the cap width, a round backer rod goes in, and sealant is filled about 1/8 in. proud of the stone.

The soft lead tee cap is pressed into the sealant bed until the bonding grooves fill and no voids remain. The flange now covers the sealant, and the opening it must bridge is cut in half.

Buildings settle and stone moves. Lead's low creep strength lets the cap creep into the new configuration, and temperature change speeds it up.

The surface oxidizes rapidly to a dead neutral grey that blends with masonry, and keeps shielding the sealant from sun, water and mold.
Choose by how the stone meets. Size by the joint opening and its movement.

For joints between units set in the same plane: coping and balustrade tops, cornices, belt courses and the top joints of window and door lintels.

For joints between units set approximately at right angles: reglets, belt courses, lintels, window sills, steps and the base of parapet walls.
Demonstration pieces from WEATHERCAP®, photographed in Slidell.

Anchor shaft set over yellow backer rod.

The cap follows the peak of a coping stone.

Soft lead dressed to an ornamental section.

Ends turned down over front and back faces.

Splined tangs that lock into the sealant.

Laid in one length wherever possible.

The cove cap meets a right-angle junction.

Shipped in continuous strips for field cutting.
The flange shields caulk from weather, prolongs its life and prevents margin checking.
The joint size the sealant must bridge is reduced by one half.
Low tensile strength, hardness, elastic modulus and creep strength let the lead creep into each new configuration, indefinitely, within the joint's design limits.

Including mold attack on covered sealant in humid climates.
Stress to copings atop parapets and right-angle junctions is buffeted by the cap.
The buildings seen throughout this site have been protected with WEATHERCAP®.

The sample specification follows GSA Historic Preservation Technical Procedure 07656-01.
Determine the extremes of joint movement with a scribe kit from the sealant manufacturer. Known and anticipated movement sets the tee cap size.
Rake or cut joints to the correct depth and clean them. Mark the cap width on the stone and run 1 in. masking tape beside the marks.
Pre-shape and cut strips to the stone profile, overlapping the joint edges by at least 1/8 in. Turn ends down over ledges and copings at least 1 in. Miter, cope or butt every junction.
Set backer rod 1/4 in. below the tip of the anchor shaft. Fill with sealant about 1/8 in. proud, then press the cap down firmly so the bonding grooves fill with no voids.
Strike off excess sealant with a putty knife, leave the masonry clean, and peel the tape.
Still unsure? Call (985) 649-4000.
Caulking a stone joint does not remove or compensate for building movement or settlement, which is among the primary causes of sealant failure. WEATHERCAP® is interposed in the caulked joint as an adjunct to the sealant: it takes the stress, covers the sealant, and reduces the joint opening to be sealed by one half.
Measure the joint opening, add the maximum percentage of joint movement found by scribe test, then add 1/4 in. The sum is the outer dimension of the installed cap. Match it to the size chart, or use the sizing guide on the products page.
Type A, the flat cap, is for joints between units set in the same plane. Type B, the 90° cove cap, is for joints between units set approximately at right angles, such as reglets, belt courses, lintels and window sills. Each is stocked in five sizes.
No. After installation the surface oxidizes rapidly to a dead neutral grey that blends with masonry. WEATHERCAP® can also be painted.
A sample specification in three parts (General, Products, Execution) based on GSA Historic Preservation Technical Procedure 07656-01, CAD drawings, the Material Safety Data Sheet, the product catalog and a lead corrosion study.
All shipments are in 6-foot lengths and ship within 48 hours of an order. Pricing is given on request. All sales are final and returns of material are not accepted.
Ask for pricing, specifications, CAD drawings or the MSDS. We reply by phone or email, at the time that suits you.
Fields marked * are required.
Thank you. WEATHERCAP® will be in touch at the time you chose. For anything urgent, call (985) 649-4000.